Hamilton Hall

University of Nebraska-Lincoln

Hamilton Hall

Sinclair Hille Architects, in association with CRB, were selected to provide professional design services for renovation of 25,500 square feet of existing laboratory space on the 3rd Floor of Hamilton Hall. Services include Master Planning & Program Verification, Schematic Design, Design Development, Construction Documentation, Bidding and Construction Administration for three separate phases of the 3rd Floor Renovation which includes an East Wing, North Wing and South Wing. 

Phase I, creates a new state-of-the-art Organic Chemistry Laboratories, a new student lounge, common areas and collaboration space for both Graduate and Undergraduate Students. A new multi-purpose classroom to support the labs is also included in the project. The total anticipated construction costs for the project is approximately $7,500,000. 

Renovations will include abatement of hazardous materials, demolition, replacement of HVAC, plumbing and electrical, telecommunications and code-related modifications needed to correct life-safety, accessibility and plumbing code deficiencies.

 
 

Related Projects

 

The design team from Sinclair Hille were sensitive to the unique needs of our business model and incorporated our requests within the overall design of our branch facility, a facility that was built not only for the needs of the bank branch today, but, also, with flexibility for what future demands might be.  We are extremely happy with the end product and appreciate the professionalism and attention to detail of the team from Sinclair Hille Architects.

Ryne Seaman

The Cattle National Bank & Trust Co.